top of page
Search

40 m pipe tandem lifted into place

  • Vista Holding
  • Jan 12, 2023
  • 1 min read

Posted on 6 December, 2015 at 11:54

Here we have a 40 m pipe being lifted into place using two Hiab cranes, Hiab cranes were used to reduce the need for a full road closure & keep weights down on the bridge that would be associated with a mobile crane.

another job completed safely.

 
 
 

Comments


bottom of page